top of page
Customer:

ПАТ «АрселорМіттал Кривий Ріг»

Type of work:

Installation of pipelines, installation of shut-off valves, reinforcement of existing joints, manufacture and installation of fittings

Year of execution:

June 2018 - November 2018

ПАТ «АрселорМіттал Кривий Ріг»

Carrying out works on technical re-equipment of the water supply system, including installation of pipelines with a diameter of 219 to 1420 mm, installation of shut-off valves with a diameter of 200 to 1400 mm, strengthening of existing joints with a diameter of 1420 mm, manufacturing and installation of shaped parts (transitions, bends).


The work is performed with high quality, which ensures the reliability and efficiency of the water supply system.

!
bottom of page