OUR PROJECTS

Completed and ongoing

THE COMPLEX OF WORK WAS CARRIED OUT FOR:

ПАТ "АрселорМіттал Кривий Ріг"

May 2018 - September 2018

Installation of the "Warman" 12/lOG-AN pump with the Lv400 main slurry pipeline

Pump and slurry pipeline installation

ТОВ "МГЗК"

2022-2024

Overhaul of ESH 10/70

Overhaul

ПАТ «АрселорМіттал Кривий Ріг»

June 2018 - November 2018

Technical re-equipment of the ROF-2 process water pipeline system on the territory of PJSC "ArcelorMittal Kryvyi Rih"

Installation of pipelines, installation of shut-off valves, reinforcement of existing joints, manufacture and installation of fittings